Continuing through 08/31/2008 - Street, water line repair scheduled around campus

Maintenance work will affect traffic and travel around three campus areas beginning May 12:

• West Oak Street will be closed from Fulton to Bonnie Brae Street May 12 to about Aug. 31, says the city of Denton. Parking will not be allowed from 6 a.m. to 7 p.m. Work crews will reconstruction the street in three phases: Fulton to Jagoe Street, Jagoe to North Texas Boulevard and North Texas Boulevard to Bonnie Brae. Vehicles remaining in the street will be towed to a nearby location. Homeowners and local businesses will have limited access to their driveways. Contact Bill Murdock, city operations manager, 940-349-7160.

• The city of Denton will replace a water main on Maple Street, from Avenue D in front of the Coliseum to Welch Street. The work will be during the day, but the street should be passable each evening. This project will last about a month, and the closure will occur block by block.

• The city will also will replace a sewer line on Chestnut Street - UNT's Parking Lots 2 and 3 - from Avenue C to street’s end in front of Hurley Administration Building. The work will be on the north side of the street (westbound traffic).

Posted in: